To prepare a competitive and accurate bid, Babcock needed full and up-to-date information on the condition and infrastructure of over 160 buildings across multiple MoD sites — all within just six months. Much of the existing documentation had become outdated due to site changes, and a full portfolio condition survey was required.
JCA Consulting were appointed to deliver comprehensive surveys, CAD drawings, and costed remedial works schedules, ensuring Babcock had the accurate building data they needed.
As Winston Sergent, Estimator at Babcock International, reflected:
“It was a dream working with JCA. Their professionalism and quality of work were outstanding. Their experience of sites like ours meant they could hit the ground running and work independently — which was invaluable in terms of time and ultimately, a successful project.”
Work Involved:
JCA supplied Babcock with a comprehensive dataset covering every building across the estate, providing greater insight than originally expected. This included condition reports, repair schedules, CAD drawings, and M&E asset information.
The surveys freed up Babcock’s internal resources to focus on their bid submission, with confidence that the technical building data was accurate, detailed, and professionally managed.
Armed with this information, Babcock successfully secured the £900 million DSG contract, a strategically important win for the business.
As Winston Sergent summarised:
“They exceeded our expectations. The depth and quality of information in their reports equipped us to verify our assets fully and manage them more easily. Their input was invaluable to our success.”